It's been a big project, but the sports court is finally done! John did an awesome job and Scott helped him all along the way. The first step was placing a water barrier and metal studs.
Then they lifted the HEAVY melamine and fastened it to the studs. John had to prepare each piece with a tongue and groove edge before it was ready to place. He also had to rig up separate contraptions to even get the pieces down into the sports court (through the window) and then up to the top of the scaffolding.
With the walls done, they could start the floor. This went a lot faster, and gave me fewer grey hairs, since everyone was safe on the ground!
Matt helped by pulling off the tape that was holding the floor in place while the glue dried. The basketball and racquetball lines were researched online and carefully marked and taped, then painted with special paint.
What a great job they have done. I'm sure it's the best in the state!!
ReplyDeleteI'm up for a game of badminton in August.
That looks great, we need to come up for some sports.
ReplyDeleteI'm impressed. Great Job!
ReplyDelete